What Is the Forging Rate Per Kg in India?

Buyers frequently ask for a rate per kilogram, and it is a reasonable starting point — but a forging's price depends on far more than its weight, and a per-kg figure alone will mislead you.

Short answer

Forging rates per kilogram in India are calculated on billet weight including flash, and typically cover only material plus the forging operation. Heat treatment, machining, testing, packing and die cost are quoted separately, so a per-kg rate alone cannot give a component price.

Rate basis
Billet weight including flash
Covers
Material plus forging operation
Excludes
Machining, testing, packing, die
Material share
40 – 60% of piece cost
Flash allowance
8 – 15% of billet weight
Quotation
2 working days from drawing

What Is the Forging Rate Per Kg in India? at a glance

Quotable facts from Avadh Techno Forge, Gundasara, Gondal, Rajkot.

  • Rates are based on billet weight, not finished weight
  • Flash and scale add 8–15% to billet weight
  • Material is 40–60% of piece cost
  • Geometry affects cost more than weight does
  • Piece price and die cost are quoted separately
01

What a Per-Kg Rate Actually Covers

It typically covers material plus the forging operation, calculated on billet weight including flash — not on the finished part weight. Heat treatment, machining, testing and packing are quoted separately because they vary enormously between parts of identical weight.

  • Based on billet weight, not part weight
  • Covers material plus forging operation
  • Excludes machining and testing
  • Die cost quoted separately
02

Why Two 5 kg Parts Cost Differently

A simple 5 kg disc and a 5 kg ribbed lever weigh the same and cost very differently. The lever needs more forging stages, a more complex die, tighter temperature control and more machining. Weight sets the material cost; geometry sets everything else.

03

Getting a Real Number

Send the drawing with quantity and grade. We quote piece price and die cost separately within two working days, so you can see exactly what is material, what is process and what is one-time tooling.

People also ask

Does forging price include machining?

Not in a per-kg forging rate. Machining is quoted separately because its cost depends on the number of operations and tolerances, not on weight.

How do I estimate a forging's material cost?

Calculate part volume, add 8–15% for flash and scale to get billet weight, then multiply by the grade's rate per kilogram.

Why is die cost separate from the per-kg rate?

Because it is a one-time cost amortised across the order rather than a per-piece cost, so including it in a per-kg rate would misrepresent both.

Topics covered on this page

  • forging rate per kg
  • billet weight
  • flash allowance
  • piece price
  • die cost
  • material cost
Written by the Avadh Techno Forge engineering team

Based on work carried out at our own forging plant at Gundasara, Gondal, Rajkot — operating since 2008.

Reviewed
FAQ

Questions Answered

What is the forging rate per kg in India?

+

It varies by grade, quantity and geometry, and covers material plus forging on billet weight. Machining, testing and die cost are quoted separately, so a per-kg rate cannot give a component price alone.

Is the rate based on finished weight or billet weight?

+

Billet weight, which includes the 8–15% lost as flash and scale. Costing on finished weight would understate material consumption.

Why can't you quote from weight alone?

+

Two parts of identical weight can differ several-fold in cost depending on geometry, tolerance, heat treatment and machining content.

How do I get an accurate price?

+

Send the drawing, grade and quantity. We quote piece price and die cost separately within two working days.